The Kuta-Canggu Tram: What Bali's 2027 Plan Actually Means
- Anushka Lockhart
- Aug 15
- 5 min read
Yes, Bali is planning a tram between Kuta and Canggu. No, you will not be riding it on your next holiday. In August 2026 the Badung Regency Government sat down with the board of PT Kereta Api Indonesia (KAI) and formally proposed a tram line linking Kuta to Canggu, anchored by a park-and-ride hub at Kuta Central Parking. At provincial level, Governor Wayan Koster has confirmed a separate airport-to-Canggu line targeted to start construction in 2027. Neither has broken ground.

That gap between the press conference and the concrete is the entire story. Bali has been promised a monorail, a coastal railway, an underground metro and now a tram. The only rail-adjacent thing you can currently see from a scooter is the South Bali Ring Road, which is genuinely under construction and genuinely will not carry a train.
We run two villas in Padonan, at the northern edge of Canggu, and traffic is the thing guests ask about more than anything else, including the surf. So here is what was actually announced this month, what quietly changed behind it, and what any of it means for a trip you are booking right now.
What Badung Regency actually announced
The August 2026 meeting between Badung Regency officials and PT KAI was not a groundbreaking. It was a proposal being turned into a formal plan, two years after the idea was first floated in 2024.
The Regent of Badung, Wayan Adi Arnawa, described an integrated public transport network as the most effective answer to congestion between Kuta and Canggu. His words: "The Kuta-Canggu tram development plan is designed to be directly integrated with the regional road infrastructure currently under construction."
The concrete details, such as they are:
Badung plans to widen main roads to as much as 24 metres, with part of that width reserved as a dedicated tram corridor.
A park-and-ride system would let drivers leave vehicles at Kuta Central Parking and board a tram running north along the coast to Canggu.
The same dedicated-lane approach is earmarked for Nusa Dua.
Physical construction sits with the Public Works and Spatial Planning Agency (PUPR). Badung's Transportation Agency, headed by Anak Agung Gede Rahamdi, would act as operator and traffic manager.
Indonesian press has put an indicative price on the electric tram system in the region of Rp 2.2 trillion.
A secondary aim, stated openly by officials, is killing off illegal roadside parking. Anyone who has crawled past Berawa on a Saturday evening knows that parked cars, not moving ones, are half the problem.
Why the subway quietly became a tram
This is the part most coverage skips. In September 2024, the Bali Urban Subway project was blessed with a ngeruak groundbreaking and consecration ceremony at Kuta Central Parking. Asked in August 2026 what had been built there since, Governor Koster was blunt: "There isn't any. There hasn't been any construction."
The subway has now been dropped. In its place, Bali is pursuing ART, or Autonomous Rail Rapid Transit. "Not MRT, but ART," Koster said, explaining the switch as "far more efficient and technologically simpler."
The practical difference matters. ART vehicles are rubber-tyred, tram-shaped and follow a sensor-guided virtual guideway rather than steel rail embedded in tunnels. They still need their own dedicated lane, separated from ordinary traffic, or the whole thing simply joins the queue it was built to escape. What they do not need is tunnelling under Kuta, which is why the cost and the timeline both come down.

The corridor remains airport to Canggu. Construction is targeted for 2027, conditional on a Governor's Regulation covering underground space use, which is still being drafted because existing spatial planning rules do not cover it. In other words: the timeline depends on a document that does not exist yet.
Bali has been promised a monorail, a coastal railway, a subway and now a tram. The only thing that has actually turned into concrete is a ring road. Plan your trip around the road, not the rail.
What this means for a trip in 2026 or 2027
Short version: nothing changes for you. Budget for traffic, build your days around it, and treat any tram news as a 2030s convenience rather than a reason to delay a booking.
The medium-term picture is more interesting, and slightly less comfortable. If Badung really does widen the Kuta-Canggu corridor to 24 metres, that means years of roadworks along exactly the stretch you would drive between the airport and Berawa. Combined with the South Bali Ring Road already in progress, southern Bali is entering a long construction decade. If you are choosing between visiting now and visiting in three years, now is the quieter option, which is not a sentence anyone expected to write about Canggu.
The genuinely good news, if it lands: a park-and-ride at Kuta plus dedicated transit lanes is the only proposal on the table that reduces the number of cars entering Canggu rather than simply giving them more room. That is the right idea. It is also the idea that has been announced, in various shapes, since 2024.
How to actually move around Canggu right now
Until a tram exists, here is what works, in the order we recommend it to guests:
Scooter. Still the fastest way through Canggu by a wide margin. You need an International Driving Permit endorsed for motorcycles plus your home licence, and police checkpoints on Jl. Raya Canggu do ask.
Private driver by the day. Roughly the price of two airport transfers and worth every rupiah for Ubud, Uluwatu or Sidemen. Ask us and we will arrange one.
Grab and Gojek. Cheap and reliable for cars, but some banjar areas restrict pickups. Walking two minutes to a main road usually solves it.
Walking. Batu Bolong to Berawa is about 25 minutes on foot and frequently beats a car at 5pm. Bring a torch after dark, the pavements are theoretical.
Timing. Avoid 8am to 10am and 4pm to 7:30pm on Jl. Raya Canggu, Jl. Pantai Berawa and the Tumbak Bayuh shortcut. Everything else is negotiable.
One structural advantage worth naming: Padonan sits north of the worst of it. Both Villa Zoya and Nomad House are above the Canggu bottleneck rather than inside it, which means you leave for dinner rather than committing to it.
Frequently asked questions
Is Bali building a train to Canggu?
Bali is planning one. A tram line from Kuta to Canggu has been formally proposed by Badung Regency to PT KAI, and a separate airport-to-Canggu ART line is targeted to begin construction in 2027. No construction has started on either as of August 2026.
When will the Bali tram be finished?
There is no completion date. Construction on the airport-to-Canggu line is targeted for 2027, but that start date depends on a Governor's Regulation that is still being drafted. Treat any completion estimate as speculation.
Is there public transport in Canggu right now?
Not in any meaningful sense. There is no scheduled bus or rail service through Canggu. Realistic options are scooter, Grab, Gojek, a private driver, or walking.
How bad is Canggu traffic in 2026?
At peak hours, a three-kilometre journey along Jl. Raya Canggu can take 35 to 45 minutes by car. The same trip by scooter takes eight. Off-peak, particularly before 8am, the roads are close to empty.
Stay north of the traffic
Villa Zoya and Nomad House both sit in Padonan, three bedrooms each, six guests, private pools, and far enough north of Jl. Raya Canggu that leaving the house does not require a strategy meeting. Whenever the tram arrives, we will be first in the queue. Until then, we will keep arranging the drivers.



Comments